Anglo Asian publishes initial resource estimate for Gilar field in Azerbaijan
Industry
- 12 December, 2023
- 09:00
Anglo Asian Mining has published a maiden resource estimate for its Gilar deposit in Azerbaijan of 6.10 million tonnes of mineralization with average grades of 0.88% copper and 1.30g/t gold, Report informs, citing foreign media.
In-situ mineral resources therefore are 54,000 tonnes of copper, 255,000 ounces of gold and 46,000 tonnes of zinc.
Development of the Gilar deposit is now well underway, with the construction of the primary transport decline tunnel and a ventilation tunnel at depths of 561 meters of the main decline and 150 meters respectively.
Latest News
14:09
Armenia's public debt expected to reach 54% of GDP in medium term
Region13:58
Lithuania will shoot down Belarus smuggler balloons, prime minister says
Other countries13:51
Slovenian minister: Azerbaijan may become key partner for EU in digital technologies - INTERVIEW
Business13:37
Pashinyan: Poverty in Armenia remains very high
Region13:31
Kyrgyz president to attend C5+1 summit in Washington
Region13:18
Azerbaijan produced 7 million tons of crude oil in Q3 2025
Energy13:08
Volume of BTC oil transportation via Türkiye drops over 5%
Energy13:04
Photo
2nd International Baku Steel Art Symposium has started in Baku
Business12:58