Armenian nuclear power plant suspends operation
Region
- 15 May, 2021
- 09:34
The Metsamor Nuclear Power Plant in Armenia has suspended operation due to the annual scheduled maintenance, during which the complete unloading of the reactor core will be carried out, Report informs referring to the plant’s website.
“On May 15, 2021, at 00:25 (GMT+4), the power unit No. 2 of the Metsamor Nuclear Power Plant began to shut down, and at 11:45 the power unit was disconnected from the power system of Armenia. The nuclear power plant stopped for an annual scheduled preventive maintenance for 141 days, which is due to the unprecedentedly large volume of work at the final stage of the program for extending the life of power unit No. 2 of the power plant,” reads the message.
Latest News
09:58
FIFA President Gianni Infantino called to appear before Congress over Trump ties
Other countries09:44
Azeri Light crude drops to $95.58 per barrel
Energy09:35
Number of UK millionaires shrinks to lowest level since financial crisis
Other countries09:21
CBA currency exchange rates (28.07.2026)
Finance09:12
Key indicators of world commodity, stock, and currency markets (28.07.2026)
Finance09:07
Two earthquakes jolt northern China
Other countries09:02
France, Spain race to contain huge wildfires before fresh heatwave begins
Other countries08:52
Rome to host next round of Israel–Lebanon talks
Other countries08:30