Armenia eyes restoring 45 km of railway section leading to Azerbaijan
Region
- 18 December, 2021
- 12:07

The Armenian government plans to restore 45 km of the Yeraskh-Julfa-Ordubad-Meghri-Horadiz section of the railway, Deputy Prime Minister of Armenia Mher Grigoryan said, Report informs referring to TASS.
“According to preliminary estimates of experts, the indicative cost of restoring sections of railway tracks passing through the territory of Armenia will be about $200 million. The length of the section (through the territory of Armenia) in total will be about 45 km, and the total length of the track will be about 340 km,” he said.
Latest News
18:01
FM: Armenia, US explore railway infrastructure projects
Region17:56
Pashinyan: Some forces seek to undermine peace with Baku
Region17:45
Hikmat Hajiyev, Christopher Landau discuss Azerbaijan-US relations
Foreign policy17:42
Mirzoyan: Peace deal with Baku a significant step, but long road ahead
Region17:34
Resident of Sumgayit Industrial Park starts exporting products to Georgia
Industry17:16
Over 180 protesters detained in Paris amid parliamentary unrest
Other countries17:13
Head of Danish company: Opening of Zangazur Corridor will simplify cargo transportation
Infrastructure17:07
Pashinyan congratulates new French Prime Minister
Region17:02