Repair works launched on second largest hydroelectric power plant in Azerbaijan
Infrastructure
- 26 August, 2019
- 10:24
Azerenerji OJSC is carrying out repair and restoration works at Shamkir Hydro Power Plant.
Report informs citing the company that the hydro units of this station were repaired and renewed as part of the "Rehabilitation Program" since last fall and spare parts for hydraulic unit number 2 were replaced, 330 kV block autotransformer was overhauled. In this way, the lost power was restored and reliability increased.
“Currently, the main attention is paid to the water intake device of the Shamkir hydroelectric power station, since after the station was commissioned in 1983, no repair work was carried out at the water intake,” the report says.
Latest News
22:46
EIA keeps Azerbaijan's 2027 oil output forecast unchanged
Energy22:34
Macron arrives in Türkiye for NATO summit
Region22:26
Global oil output to return to pre-conflict levels by end-2026
Other countries22:18
Photo
World Cup 2026: Argentina beat Egypt to reach quarterfinals
Football22:06
US raises 2026 oil output forecast
Other countries22:02
Canada pledges new support for Ukraine's air defenses
Other countries21:44
Erdoğan says Türkiye, US can resolve agenda issues through solidarity
Foreign policy21:37
Photo
Ukraine, Netherlands sign drone cooperation deal
Other countries21:17