Construction of Horadiz–Aghband railway planned for completion in 2026
Infrastructure
- 05 September, 2025
- 18:21

The construction of the Horadiz–Aghband railway is expected to be fully completed in 2026, Bakhtiyar Hajiyev, Head of the Public Relations Department of Azerbaijan Railways (ADY), told journalists in Zangilan.
According to Report"s correspondent in Zangilan, he noted that as part of the implementation of the Zangazur Corridor ("Trump Route"), Azerbaijan is carrying out construction of the Horadiz–Aghband railway. Design work for the railway line has been completed by 84%, while construction and installation work has reached 67%.
Latest News
11:41
NOC vice president: Azerbaijan hosting another sports festival
Individual sports11:40
Azerbaijan congratulates Andorra on national holiday
Foreign policy11:37
Trial continues for ethnic Armenian suspects accused of war crimes
Incident11:35
Baku to host 67th General Assembly of International Association of Judges
Incident11:29
Ilham Aliyev sends congratulatory message to President of North Macedonia
Foreign policy11:23
President Ilham Aliyev congratulates President of Tajikistan
Foreign policy11:18
Azerbaijan's Foreign Ministry congratulates North Macedonia on National Day
Foreign policy11:14
Kazakhstan's FM Nurtleu comments on his alleged arrest rumors
Region11:10