Azerbaijan Railways talks on Aghdam-Khankandi railway line progress
Infrastructure
- 06 January, 2026
- 14:05
The design of the Aghdam-Khankandi railway line in Azerbaijan is 81% complete, with construction and installation work 29% complete, Report informs referring to Azerbaijan Railways.
The total length of the railway line is 28 kilometers, or 30.8 kilometers including sidings.
The project includes the construction of three stations – Asgaran, Khojaly, and a railway and bus station complex in Khankandi. In addition, 124 engineering structures are planned.
Latest News
23:56
Yaşar Güler: Heroism of martyrs and veterans is the strongest guarantee for Türkiye and Azerbaijan
Region23:48
Schools in 48 remote villages switch to distance learning this year
Education and science23:41
Bloomberg: US automakers urge Trump to ban imports of Chinese cars
Other countries23:27
Azerbaijan to introduce specialized education model in 90 more schools
Education and science23:17
Čeferin calls on Infantino to pay €8.75 million to each FIFA member association
Football22:56
The Hill: Trump to sign bill on anti-Russia sanctions overnight Friday to Saturday
Other countries22:41
Trump says Iran wants to reach deal with US
Other countries22:22
Azerbaijan arranges discussion on rights of landmine victims at UN
Foreign policy22:05