Azerbaijan Railways talks on Aghdam-Khankandi railway line progress
Infrastructure
- 06 January, 2026
- 14:05
The design of the Aghdam-Khankandi railway line in Azerbaijan is 81% complete, with construction and installation work 29% complete, Report informs referring to Azerbaijan Railways.
The total length of the railway line is 28 kilometers, or 30.8 kilometers including sidings.
The project includes the construction of three stations – Asgaran, Khojaly, and a railway and bus station complex in Khankandi. In addition, 124 engineering structures are planned.
Latest News
11:13
Saudi Arabia, UAE report missile, drone attacks
Other countries11:09
US tanker aircraft arrive in Romania for redeployment to Middle East
Other countries11:05
Azerbaijan invites Japan's environment minister to participate in WUF13
Foreign policy10:53
Emirates airline to run limited Dubai flights
Other countries10:48
Servicemen of Azerbaijan's State Agency for Protection of Strategic Objects awarded
Domestic policy10:39
Brent crude oil prices rise $1.74, reach $104.88
Energy10:37
Azerbaijan exceeds forecast for social insurance contributions
Finance10:05
ASCO vessels transporting pipes for the TAPI project
Energy09:55