Azerbaijan Railways talks on Aghdam-Khankandi railway line progress
Infrastructure
- 06 January, 2026
- 14:05
The design of the Aghdam-Khankandi railway line in Azerbaijan is 81% complete, with construction and installation work 29% complete, Report informs referring to Azerbaijan Railways.
The total length of the railway line is 28 kilometers, or 30.8 kilometers including sidings.
The project includes the construction of three stations – Asgaran, Khojaly, and a railway and bus station complex in Khankandi. In addition, 124 engineering structures are planned.
Latest News
11:31
US warns Europe of delays to arms shipments as Iran war drains stockpiles
Other countries11:16
Photo
Baku hosts exhibition titled "In footsteps of Azerbaijan's nature"
Art11:10
Azerbaijan's Parliamentary Commission: Pro-Armenian circles attempting to undermine fragile peace process, harm interstate relations
Foreign policy11:02
Photo
Reps of foreign diplomatic corps in Azerbaijan leave for Lachin
Karabakh10:52
Hajiyev: Gazanchi Church in Azerbaijan's Shusha restored in accordance with its original architectural style
Karabakh10:48
Azerbaijani oil price falls
Energy10:44
Hajiyev shares photo with military attachés in Azerbaijan's Shusha
Foreign policy10:31
Esaulenco: Azerbaijan - only country in region that restored its territorial integrity
Karabakh10:25