CPC reports difficulties in repairs at terminal in Black Sea
Energy
- 21 October, 2022
- 11:09
Add Report.az to preferred Google sources
Stay up to date with the top news!
The Caspian Pipeline Consortium (CPC) is not in a hurry with forecasts for the repair of remote mooring units (TLU) at the terminal in the Black Sea, Report informs, citing the Russian media.
The CPC informed that at present the vessel, which will be involved in the repair work, has arrived in the water area of the consortium's marine terminal.
Repair work has not started, preparations are underway for their implementation, the CPC noted, adding that there are restrictions.
A storm alert has been announced today and some preliminary and inspection operations have been suspended, the company said.
Latest News
15:36
Azerbaijan to increase agricultural subsidies in 2027
Finance
15:35
BP brings deep reservoir oil well online at ACG
Energy
15:26
Photo
Video
Azerbaijan and Russia sign emergency cooperation plan for 2027–2029
Domestic policy
15:19
Eurozone inflation hits three-year high
Economy
15:18
Azerbaijan plans AZN 736 million investment in Alat Free Economic Zone infrastructure
Industry
15:07
Photo
Azykh Cave: The Cradle of Azerbaijan premieres in Istanbul
Cultural policy
15:01
Russia and Kazakhstan sign military cooperation plan for 2027
Region
14:49
Finance minister: 11–13% of state budget spent on Garabagh reconstruction
Finance
14:45
Sangachal terminal exports 138 million barrels of oil and condensate
Energy